Intel 14th Gen Core desktop “Meteor Lake” allegedly requires new LGA-2551 socket

Please note that this post is tagged as a rumor.

Intel might be saying goodbye to LGA1700/1800 already in 2023

According to the latest rumors from Moore’s Law is Dead, Raptor Lake-S might be the last desktop series for the LGA1700 socket.

14th Gen Core Meteor Lake

It would appear that the rumors stating Intel will keep 3 generations on the same socket are untrue. In the fourth quarter of 2023 when Intel is expected to launch a new desktop series codenamed Meteor Lake, an entirely new socket might be required.

The LGA 2551 wouldn’t be much bigger than the LGA1700 socket though. According to MLID, it’s 38 × 46 mm, which means 0.5 mm wider and 1 mm taller socket. However, the 2551 indicates it will have 50% more pins.

MLID posted a real photo (although slightly altered) of the alleged LGA 2551 processor:

Intel LGA2551 CPU, Source: MLID

Furthermore, MLID reaffirms the rumors that were shared by other leakers over the past few weeks, but has a different idea on the expected launch date. In this case, we should expect MTL-S in fourth quarter of 2023, not in 2024 as mentioned elsewhere. Unfortunately, MLID is not confirming the core configuration for desktop Meteor Lake series, so one might guess it could be similar to Raptor Lake.

Intel Meteor/Arrow lake rumors, Source: Moore’s Law is Dead

15th Gen Core Arrow Lake

The Lion Cove/Skymont cores might already debut with Arrow Lake. These new microarchitectures were previously rumored for Lunar Lake. As mentioned in previous leaks, the 15th Gen Core would not see an increase in Performance cores, but Efficient cores count would double over Raptor Lake, now counting 32 in total.

More importantly, Arrow Lake desktop would be compatible with LGA 2551 socket, so at least two generations would be supported by the new desktop platform. This architecture is expected to compete with AMD’s Zen6 architecture, which has not been confirmed by the company yet. One shouldn’t expect Arrow Lake sooner than second half of 2024 though.

Intel Mainstream CPU Roadmap (RUMORED)
VideoCardzAlder LakeRaptor LakeMeteor LakeArrow LakeLunar Lake
Desktop Launch DateQ4 2021Q4 2022Q4 2023 2H 20242024+
CPU NodeIntel 7Intel 7Intel 4 Intel 20AIntel 18A
Big Core µArchGolden CoveRaptor CoveRedwood CoveLion CoveTBC
Small Core µArch GracemontGracemontCrestmontSkymontTBC
Graphics µArchXe-LPXe-LPXe-HPGXe-HPGXe2-HPG
Max CPU Core Count16 (8C+8c)24 (8C+16c)TBC40 (8C+32c)TBC
Max GPU Core Count96 EU96 EU192 EU320 EUTBC
Desktop SocketLGA1700LGA1700LGA 2551LGA 2551TBC
Memory SupportDDR4/DDR5-4800DDR4/DDR5-5600DDR5TBCTBC
PCIe GenPCIe 5.0PCIe 5.0PCIe 5.0TBCTBC
Intel Core Series12th Gen Core13th Gen Core14th Gen Core15th Gen Core16th Gen Core

Source:

[Moore’s Law Is Dead] Intel Arrow Lake, Meteor Lake, Raptor Lake Leak: Crazy Performance, Crazier Delays (16,999 views)



Read original article here

Leave a Comment